At this stage of the project, different steps have been taken in engineering and purchasing such as:
● Conceptual design of the installation
● Static calculation
● Detail design and workshop drawings of the steel structure
● Basic electrical engineering
In the meantime, PEG is coordinating their work with the construction/design of the hangar.
For this project, discussions began in the middle of 2007, however, the final contract has been signed in January 2008. In order to cope with the shift initially scheduled for October 2008, PEG S.E.A. has
mobilized their teams to carry out this project in the best conditions.
|