|
CLIENT
|
COUNTRY / YEAR
|
GENERAL SCOPE OF WORK
|
|
Lufthansa Technik
|
Malta
2007- 2008
|
Turnkey project for the engineering, fabrication,
installation and commissioning of two (2) complete
Maintenance Docks for Airbus wide-body aircrafts.

|
|
Lufthansa Technik
|
Bulgaria
2007-2008
|
Turnkey project for the engineering, fabrication,
installation and commissioning of two (2) Tail Docks
for Airbus narrow-body aircrafts.

|
|
Goetz Engineering
(SMS-DEMAG, Tokyo installation)
|
Germany / Japan
2007
|
Mechanical and steel engineering of heavy machinery;
cold rolling mill for steel sheets, in particular
the pickling / tandem cold mill.

|
|
Goetz Engineering
(SMS-DEMAG, Handan
installation)
|
Germany / China
2007
|
Mechanical and steel engineering of heavy machinery;
cold rolling mill for steel sheets, in particular
the pickling / tandem cold mill.

|
|
Goetz Engineering
(SMS-DEMAG, MMK
installation)
|
Germany / Russia
2007
|
Mechanical and steel engineering of heavy machinery;
cold rolling mill for steel sheets, in particular
the pickling / tandem cold mill.

|
|
Fives FCB
(Hermosillo Cement
-
Holcim)
|
France / Mexico
2007-2008
|
Engineering required for process ducts for coal and
pet coke grinding.

|
|
Goetz Engineering
(SMS-DEMAG, Handan installation)
|
Germany / China
2008
|
Mechanical and steel engineering of heavy machinery;
cold rolling mill for steel sheets, in particular
the pickling / tandem cold mill.
|
|
HOLCIM
(Carthago Cement)
|
Costa Rica
2008
|
Extension and modernization of the plant
incorporating engineering and supervision of the
construction of clinker transport from silo to
cement mill and raw meal transport to homogenizing
silo and to preheater feed.
|
|
Modern Cement and Mining Company
|
Jordan
2008
|
Checking of Civil Drawings for a cement plant with a
capacity of 3,500 tons clinker.
|
|
Goetz Engineering
(SMS-DEMAG, MMK installation)
|
Germany / Russia
2008
|
Mechanical and steel engineering of heavy machinery;
cold rolling mill for steel sheets, in particular
the pickling / tandem cold mill.
|
|
Goetz Engineering
(SMS-DEMAG, Tokyo installation)
|
Germany / Japan
2008
|
Mechanical and steel engineering of heavy machinery;
cold rolling mill for steel sheets, in particular
the pickling / tandem cold mill.
|
|
Oman Airlines
|
Switzerland / Oman
2009
|
Structural Analysis of Aircraft Maintenance
Step-Platforms for Wide-Body Airbus
|
|
CEMEX
Solid Cement Corporation
|
Philippines
2009
|
Kiln Shell repairs during emergency shut-down
|
|
CEMEX
Solid Cement Corporation
|
Philippines
2009
|
Replacement of the existing Extension of Kiln # 3
Chimney
|
|
CEMEX
Solid Cement Corporation
|
Philippines
2009-2010
|
Replacement of two Kiln Shell Sections
|
|
CEMEX
Solid Cement Corporation
|
Philippines
2010
|
Structural support of Kiln # 3 Chimney
|
|
HOLCIM Philippines
Bulacan Plant
|
Philippines
2010
|
Generation of as-built drawings for Cement Silo # 8
|
|
LAFARGE Republic Cement
Teresa Plant
|
Philippines
2010
|
Generation of as-built drawings
|
|
LAFARGE Republic Cement
Teresa Plant
|
Philippines
2010
|
Demolition of Silos
|
|
LAFARGE Republic Cement
Bulacan Plant
|
Philippines
2010
|
Replacement of three Kiln Shell Sections
|
|
ADAT
|
Switzerland 2010
|
Concept Paint-Dock for wide-body aircraft
|
|
AMAC
|
Switzerland 2010
|
Concept Nose- and Fuselage-Dock for 777 / 747
aircraft
|
|
CEMEX
Solid Cement Corporation
|
Philippines
2010 – 2011
|
Calciner Modification
|
|
HOLCIM Philippines
La Union Plant
|
Philippines
2010
|
Generation of as-built drawings for Cement Silo
|
|
Carthage Cement
|
Switzerland / Tunisia
2010-2011
|
Checking of Drawings for a cement plant with a
capacity of 5.800 TpD.
|
|
Chad Baoare Cement
|
Switzerland / Chad
2010-2011
|
Checking of Drawings for a cement plant with a
capacity of 200.000 TpY.
|
|
PEG Aviation
|
Switzerland 2010-2011
|
GA for Airline docks
|
|
LAFARGE Republic Cement
Teresa Plant
|
Philippines
2011
|
Demolition of Crusher
|
|
LAFARGE Republic Cement
Bulacan Plant
|
Philippines
2011
|
Horomill repair
|